How to Schedule Multiple Loads

 Shippers

Apps: Web 

App Version: 3.8

 

Overview

  • How to use the # of Loads field to schedule multiple loads at the same time.

Schedule Multiple Loads

  1. Click Add a New Load and fill out relevant information.

    mceclip1.png
  2. Enter the number of loads needed in the # of Loads field.

    mceclip0.png
  3. Click Save.

    mceclip3.png
  4. Once saved, the loads will show in the Schedule tab. 
Was this article helpful?
0 out of 0 found this helpful

Comments

0 comments

Please sign in to leave a comment.